Home » Projects
Projects
Shetland Gas Plant for Total
Total are constructing a major gas plant alongside the existing oil terminal at Sullom Voe and Tulloch Developments have undertaken a range of associated work.
Substation Bases and GRP Shelters
Tulloch Developments has undertaken work over several years for Scottish and Southern Energy, involving the construction of concrete bases for new substations and the installation of GRP shelters.
Play Areas Throughout Shetland
Tulloch Developments has now undertaken the construction of many play areas throughout the islands, including several in Lerwick.
Site Preparation and Servicing at Hoofields, Lerwick
In order to help meet the demand for housing in Lerwick, Tulloch Developments were engaged to undertake site preparation and servicing at Hoofields.
Scapa Pier Dredging
Tulloch Developments won a contract from the Orkney Islands Council for dredging around Scapa Pier.
Fibre Optic Cable Laying For Shetland Telecom
Work to improve telecommunications has included connecting the islands to the cable that runs from Faroe to the Scottish mainland and which crosses Shetland between Maywick and Sandwick.
Tesco Car Park Extension
Tulloch Developments won a contract with Barr construction to construct the new car park extension in Lerwick.
Berths 7 and 8 at Greenhead, Lerwick
Although the port of Lerwick has substantial wharfage, demand for space has continued to grow.
Mooring Dolphin at Holmsgarth
A mooring dolphin at the Holmsgarth ferry terminal had been damaged by a ship during a storm and the Lerwick Port Authority engaged us to undertake the necessary remedial work.
New Deck at the Small Boat Harbour, Lerwick
This project was undertaken on behalf of the Lerwick Port Authority in close liaison with the Lerwick Boating Club.
Faroese Subsea Fibre Optic Cable
Tulloch Developments Ltd assisted with landing of this sub-sea fibre optic cable on the shore at Banff, Sandwick and Maywick.
Scousburgh Water Tank
Tulloch Developments Ltd. won a subcontract from Rosshire Engineering to construct a 100m3 bulk water storage tank
Dunrossness Cemetery Extension
Work comprised of excavating the entire site to 8 feet below ground level, screening the material and reinstatement of screened material. A final layer of topsoil was spread across the surface.
Oversund Roundabout
Construction of a new 4-exit roundabout on the main round southbound from Lerwick, Shetland
Gilbertson Road Resurfacing
Tulloch Developments won the contract to resurface Gilbertson road from the North Road, up to the Bells Brae Primary School, Lerwick, Shetland.
SBS Load Relieving Slab
A reinforced concrete slab was cast on a foundation of H piles driven to bedrock, to take and support the load of the loading ramp and module during the unloading of the decommissioning work at the Greenhead base.
Small Boat Harbour Phase 1
Tulloch Developments secured the contract to construct the new sea defence wall at the Small Boat Harbour, Lerwick, Shetland