SBS Load Relieving Slab

A reinforced concrete slab was cast on a foundation of H piles driven to bedrock, to take and support the load of the loading ramp and module during the unloading of the decommissioning work at the Greenhead base.

  • Contract Value: £200,000
  • Contract Length: 3 Months
  • Started: November 2005
  • Client: Lerwick Port Authority

Project Description

A reinforced concrete slab was cast on a foundation of H piles driven to bedrock, to take and support the load of the loading ramp and module during the unloading of the decommissioning work at the Greenhead base.

48 H piles, 16meters long and made from 2inch thick steel were driven till bedrock, to support the gigantic weight of the module.

The concrete was poured all in the same day with a total of 108m³ being placed between 7.30am and 4pm in the only 2 R9 reimer mixer trucks.